This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
en:software:tim:instance_context_efforts_report [2014/11/25 12:40] duc.le |
— (current) | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | |||
- | |||
- | ===== Effort report===== | ||
- | |||
- | In T!M, effort reports can be displayed and downloaded as XLS-Document. This can be done via the context menu which opens by right-clicking the particular instance. | ||
- | {{ en:software:tim:efforts_task.png?600 |}} | ||
- | |||
- | Efforts can be stored for a task. These efforts can either have the unit cost or time. | ||
- | |||
- | {{ en:software:tim:efforts_create.png?600 |}} | ||
- | |||
- | ^ Array ^ Descritpion^ | ||
- | | **Type** | Selection whether it is a time or a cost effort. | | ||
- | | **Effort** | How big the effort was can be entered here. (Cost = Currency, Time = Minutes) | | ||
- | | **Accounts** | The relevant account can be entered here. | | ||
- | | **Description** | An additional description can be entered here, which defines the effort in detail. | | ||
- | |||