This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
en:software:tim:effort [2016/05/24 10:18] amanda.zens created |
en:software:tim:effort [2021/07/01 09:52] (current) |
||
---|---|---|---|
Line 7: | Line 7: | ||
^ Field ^ Description ^ | ^ Field ^ Description ^ | ||
- | | **Type** | Choose whether the selected effort is summarized on a monetary- or a temporal basis. | | + | | **Effort Type** | Choose whether the selected effort is summarized on a monetary- or a temporal basis. | |
- | | **Effort** | The magnitude of the effort is summarized here (cost = currency, time = minutes) | | + | |
- | | **Cost center** | The appropriate cost center is entered here. | | + | |
| **Description** | An additional description may be given here in order to summarize the effort in greater detail. | | | **Description** | An additional description may be given here in order to summarize the effort in greater detail. | | ||
+ | | **Cost center** | The appropriate cost center is entered here. | | ||
+ | | **Effort** | The magnitude of the effort is summarized here (cost = currency, time = minutes) | | ||
+ | |||
+ | |||
The summarized efforts for a given task are listed in the table that is found in the "Efforts" tab (see screenshot). | The summarized efforts for a given task are listed in the table that is found in the "Efforts" tab (see screenshot). |